Italian Air Force – 3rd Military Engineering Department – 16th Group Battlefield Military Engineering
Supply and installation of a new prefabricated panel type electrical cabin, complete with the relative systems, and construction of the systems for the flight surfaces at Sigonella Airbase.
The project involves the execution at Sigonella Airbase of all of the works and supplies required for the construction of a new electrical cabin and the AVL systems on the main and secondary runways, the intersections and the taxiways.
In detail, the following works will be realized:
- New electrical cabin called 22A
Dismantling of equipment and demolition of the old cabin 22A; dismantling and relocation of the external canopy for recovery of the generator group; supply and installation of the prefabricated panel structure and accessory works for the new electrical cabin 22A, complete with M.V., F.M., lighting, grounding, air conditioning, alarm and fire detection systems. - AVL system serving the main and secondary runways, the intersections and the taxiways
Upgrading of the LV and special systems in the existing electrical cabins serving the A.V.L. system; construction of reinforced concrete foundations; installation of billboards; installation of lamps; supply and installation of cables.