Renovation of electrical and mechanical systems in the buildings of the DT3 head office
Renovation of the electrical and mechanical systems used in the buildings of the head office of the Tronco 3 Bologna Management site of Autostrade per l’Italia
The works involve the adjustment of the electricity distribution system, air conditioning and lighting systems in use in the Management Building and the Systems Building at the head office of the Tronco 3 Bologna Management site of Autostrade per l’Italia S.p.A.
The work is aimed at the adjustment and renovation of the rooms inside the buildings, from an architectural/civil engineering viewpoint and regarding the electrical and lighting systems, structured wiring and air conditioning. There will also be work regarding partial mechanical adjustments to the water distribution system on the site, which is required for the renovation of the collectors and circulatory systems of the water circuits serving the two buildings, the installation and testing of instrumentation and sensors integrated in the new BMS system and the installation in the panels room of the new panel powering the circulators and the BMS concentrator.




